Shearer Design - Calgary, Alberta  
Shearer Design - Calgary, Alberta
Alberta Electric Systems Operator
integration     |     intelligence     |    ergonomics

The Power Pool & Transmission Administrator joined to form aeso. A convergence that fostered clarity of culture. The open plan offers the benefits of increased daylighting & visual connectivity between co-workers. It unites over 250 employees, on five floors, in an ergonomic, function-based atmosphere. The boardroom, with sophisticated sound & AV, has an adjoining servery & break-out rooms.


Alberta Electric Systems Operator

Click on photo to enlarge